“ Our objective was to join the main house to the lake house. Structures Construction worked
closely with the architect, engineer, and the bridge manufacturer to bring our plan into reality.
They made a difficult task easy.”
-Homeowner
This project was the construction of a 120’ long, 3' span aluminum bridge, including cast-in-place concrete piers and cantilevered end span to pool deck. The project was customized for a private owner.
Michigan Ave Bridge
Location: Chicago IL
Testimonial/Description:
Role: General Contractor
Architect: AECOM
Download the
Brochure here
Service: Custom Build-Out